Results 21 to 30 of 32
Thread: Hub webcam
-
07-26-2018, 04:57 PM #21
-
04-01-2019, 04:42 PM #22
More info on the HUB
https://www.youtube.com/watch?v=glqEAuCAfLo
-
08-05-2019, 01:15 PM #23
HUB update:
https://xaviernewswire.com/2019/08/0...CuzFpF6_HngDOM
The HUB itself is a massive building with four floors, spanning roughly 160,300 square feet. According to Xavier’s website, the two chief construction partners on the project, Messer construction and MSA architects, designed the building to be ten times larger than O’Connor Sports Center. It is expected that anywhere from 2,500 to 3,000 students will visit the building every day, making it a significant destination on campus.
The final feature, a multi-purpose court will be opening in March of 2020. The Newswire previously reported that this item was originally scrapped, but has since been added back onto the design plans when a $3 million contingency packet was not needed.
10x's larger than O'Connor. Let that sink in!
Once this place finally opens, coupled with the success of the capital campaign, the climb for the strategic positioning goal will be fully underway. Fun times.Last edited by xudash; 08-05-2019 at 01:19 PM.
X A V I E R
-
01-31-2020, 01:48 PM #24
Finish product is pretty cool
https://www.youtube.com/watch?v=u1BnxvRPeGc
-
01-31-2020, 02:44 PM #25
My exercise program consisted of walking from Marion or Elet Hall to Danas, and back.
Often quite challenging....he went up late, and I was already up there.
-
01-31-2020, 02:52 PM #26
-
01-31-2020, 02:55 PM #27
-
01-31-2020, 03:38 PM #28
Ok, somebody answer me this.
What is the "Motel" looking building that is going up next door to The Hub and University Station closer to Dana Avenue now?
I can't get an answer to the question."I Got CHAMPIONS in that Lockerroom!" -Stanley Burrell
-
01-31-2020, 04:22 PM #29
Looks like an expansion for U Station.
https://xaviernewswire.com/2019/10/3...ion-announced/
-
01-31-2020, 04:24 PM #30
Bookmarks